Saturday, March 14, 2015

Saturday check - π day


3.14.15 We went out for our weekly snoop progress check. The first floor is sheathed and wrapped, most second floor joists up, most interior first floor partitions done.






Looking from the living room through the kitchen and dining area out the front window







 and out the rear.















Making a few measurements ...





... a small bench would fit here.

This is where we would enter from the garage (from the right). Laundry to the left of Ginnie, powder room to the right.




Looking through a few walls, from the living room rear into MBR, and closets at the far end. Drywall has been inserted into the dividing wall cavity.




A few more joists to go. The framing is very impressive with these joists heading up on a 12" laminated wood beam. The beam behind, spanning a longer distance, is a full 18" high, 6" thick. 





Right behind the house I noticed a good patch of ground pine, a plant I have always liked and associate with camp.





Snow in the hole. The basement has a good snow cover. Given recent weather, that will probably last for a while. We did notice that #22 had heaters roaring in the basement to thaw things. That pair of houses are now under roof, windows and doors in, etc., ready for plumbing and heating installation.






 

No comments:

Post a Comment