Inside, the furnace is placed, ducts in progress, etc.
The sill plate has been foamed all around for air tightness and insulation. All the floor plates are caulked as well.
The egress window is in.
Wiring is mostly done, but the electrical panel isn't placed yet, the basement needs to be wired, a few outlets missing, etc.
The unfinished siding is waiting on something for the fireplace vent.
Ginnie had been wondering if the 3 lights over the sink counter were placed so we would be working in shadow. It's hard to visualize how far counters extend, etc. without a ruler
Not to worry, the lights are placed well. They've done this before.
Yesterday I stepped out back to check out the scene from the wildlife's perspective. This was the high spot. Beyond here the land slopes down to the lake, about a quarter mile away.

No comments:
Post a Comment