We managed to hold off visiting until after lunch. The place was buzzing with 2-3 electricians, tile guy, painters, etc. The gas line had been buried through the yard, the yard graded, and topsoil spread. All before lunch.



The second floor has had its second coat of paint and all electrical stuff is in place.



rear / 2nd floor master bedroom






front 2nd floor bedroom
v






MBR shower in progress
Bothersome outlets have been raised. Bring on the backsplashes ... and some drywall to fill the gap.

One week to closing!